*Achieving 1.33 Cpk and World-Class OEE*
- Industry: FMCG / Beverage Production
- Challenge: Inconsistent OEE and quality variations across lines.
- Solution (ITC Senior Team): Lean manufacturing, increased Cp/Cpk to 1.33, reliability-centered maintenance.
- Results:
- ✅ OEE increased 18% in 10 months
- ✅ 1.33 Cpk across all major SKUs
- ✅ Passed FSSC 22000 & KORE audits
- ✅ Significant material waste reduction