Saves Millions of USD
- Industry: Petroleum Refining / Heavy Engineering
- Challenge: Refinery built for API 37 light crude, but forced to process API 41 heavier crude → premature flashing, pressure spikes, tower bottleneck, 25% production cut, safety risks.
- Solution (ITC Senior Team): Crude composition analysis, root cause identification, designed & installed a Preflash Tower before main distillation column to separate light fractions early.
- Results:
- ✅ Preflash Tower produces additional Naptha as saleable product
- ✅ Tower pressure returned to normal
- ✅ Bottleneck eliminated
- ✅ Throughput restored to 100% design capacity (+5% better fractionation)
- ✅ $8–10 million USD saved annually
- ✅ Safety risk eliminated
- ✅ Payback < 6 months